AGL VPP partnership

HoLeeFook
0 Replies 925 Views

VPP with a difference. AGL to install and maintain a battery on the customers premises. The customer has access to 20% of capacity except for peak load events. AGL can use the remaining battery capacity any way they require. Power is generated and consumed locally. Reducing some of load on the transmission infrastructure. If the above is not feasible. Similar installation and the customer gets preferential rates on imports and exports of energy for having an AGL  battery on their premises