Smart meter upgrade

Tayt
Switched-on
1 Reply 3133 Views

Hi,

We had solar installed recently and need to upgrade the meter to a smart meter.

We live a 3 townhouse complex and share the main switchboard with 2 other properties which already have solar and smart meters installed.

I was told a MPD is required to be installed to isolate our property from the other 2 when upgrading the meter to a smart meter.

Will an AGL technician install the MPD on the day or is this something I need to arrange privately with a level 2 electrician ?

1 REPLY 1
-Steve-
AGL Moderator
0 Replies 3103 Views

Hi Tayt, please call the solar new connections team directly for this, they will be able to advise what needs to occur, you can get in touch with them here.