Con the controlled meter be set to supply power only in the off peak and shoulder time periods. I have been notified that the peak rate is changing from 18c to 49c.

2 REPLIES 2
Deepesh_AGL
AGL Moderator
1 Reply 175 Views

Hi GarryDD55, It would be best to engage with an electrician who can provide you options to rewire your Controlled load to supply power in off peak and shoulder only. Cheers, Deepesh

GarryDD55
Conductor
0 Replies 171 Views

Thanks Deepesh. I will need to do something.