solar export

ebuorg
Switched-on
1 Reply 6094 Views

Hi AGL

Just installed 9.99Kw of solar panels & waiting for Essential to install smart meter on the 28th.

Looking to switch to AGL with 17 cent FIT plan.

1. Can I switch to AGL once the meter is installed? or do I have to stay with current retailer until next bill date?

2. What is the export limit to the grid, i.e. 5Kwh or 10Kwh?

regards

ebuorg

2 REPLIES 2
-Steve-
AGL Moderator
1 Reply 6075 Views

Hi ebuorg, once the meter is installed, get in touch and we can arrange for the transfer to occur, this will take place as of the next available read after your 10 business day cooling off period.

We have no export limit for solar under our standard plans, to be eligible for the Solar Savers Plan though we have a panel limit of 10kw. 
 

ebuorg
Switched-on
0 Replies 5582 Views

Hi Steve

 

Thanks for the reply which has answered my questions.

 

regards

Ebuorg