I have ducted air conditioning that needs replacement. The existing hot water system was connected to controlled load 1. Am I also able to connect the air conditioner to controlled load and change both to controlled load 2?
Connecting your air-conditioner to a controlled load would mean that it would only be available during Off Peak hours (23:00 to about 06:00 in most States).
To run it during the day you would have to manually push the by-pass switch to use it (this is Peak Rates).
If you have two controlled loads you would be better off to have the heater on one and AC on two (if both are available).
Other wise if you press the bypass button then you may be heating your hot-water at peak rates during the day.
You will have to pay for an electrician to wire up both connections.
Hope this helps.
Cheers Neil
If this solves your question please re-solve this, either way please press the like button if you find it helpful.
Thanks @NeilC. I have since contacted Essential Energy, who are the distributors in my area of NSW. They confirmed that I am not able to connect AC to CL. My intent was to change to CL2 that provides 16 hours per day but will need to look at other options for AC. It might be time to upgrade my solar system after all.
NeilC
+22 more
Powerhouse
•
5 years ago
@homeenergysaver,
Connecting your air-conditioner to a controlled load would mean that it would only be available during Off Peak hours (23:00 to about 06:00 in most States).
To run it during the day you would have to manually push the by-pass switch to use it (this is Peak Rates).
If you have two controlled loads you would be better off to have the heater on one and AC on two (if both are available).
Other wise if you press the bypass button then you may be heating your hot-water at peak rates during the day.
You will have to pay for an electrician to wire up both connections.
Hope this helps.
Cheers Neil
If this solves your question please re-solve this, either way please press the like button if you find it helpful.
4
0
Accepted Solution
homeenergysaver
+2 more
Conductor
•
5 years ago
Thanks @NeilC. I have since contacted Essential Energy, who are the distributors in my area of NSW. They confirmed that I am not able to connect AC to CL. My intent was to change to CL2 that provides 16 hours per day but will need to look at other options for AC. It might be time to upgrade my solar system after all.