quinny's latest conversations

quinny Conductor
16-04-2023

Re: Drawing from grid and exporting at same time

Check with whom ever installed your solar and make sure they have connected to all circuits, maybe they could not connect to all of them and so one is pulling from the grid whilst the others are covered by the solar.eg. power and lights circuits hooked to solar but maybe shed is not.this turned out to be the issue I had, no room to connect to all of house so they connected just to shed circuit with pool pumps as they used the most power
22 Replies 0 Likes
quinny Conductor
25-10-2017

Re: Drawing from grid and exporting at same time

Reaching out..... I just spent 61 minutes 35 seconds talking to 5 different people at AGL at not one knew what to do, even one said "What do you want us to do about it..." before transferring to someone else and I had to start again. In the end the last person in metering tells me I need to talk to Activestream as they did the job. I phone Activestream 19 min 47sec telling me they cannot do anything without AGL looking at it and to go back there and would not give a job number "they don't do tha ...
22 Replies 0 Likes
quinny Conductor
25-10-2017

Re: Drawing from grid and exporting at same time

I gather nobody from AGL can explain or to busy trying to make the usage site work??
22 Replies 0 Likes
quinny Conductor
21-10-2017

Drawing from grid and exporting at same time

Can anybody tell me why I show that I am drawing from the grid AND exporting at the same time in the middle of the day. Was changed over to NET metering a couple of months ago.Seems like a way for AGL to make money, Charge for power at a high cost and give me a lttle money for the export at the same time, when I should be using all my solar and not drawing from the grid.Please explain???Or would this just be a technical difficulty the AGL have every day with everything?
22 Replies 0 Likes