About vipermla

Rank: Switched-on

Learn more about ranks and badges.

vipermla's latest conversations

vipermla Switched-on
04-07-2018

MARK 7A2 needs to be replaced with MARK 7C to take off the controlled load supply???

I am having AGL take out the controlled load (for the last 9 years) and I have a smart meter MARK 7A2 (I believe) in the premises already. Now their contractor has called and said that they have to replace my smart meter with another smart meter (MARK 7C). My question is why replace the meter? both are smart meters and they can just shut off the controlled load from their office right? Now I have to be at home for them to do their job!
1 Reply 0 Likes