I agree with you I feel I'm being ripped off also.Control load power comes on 3 times a day with the new smart meter installed (which I did not ask for) when it only came on 2 times on the old digital meter.Being home all day as a retired home owner I turn the control load circuit breaker off for up to 3 or 4 days to break the cycle of the new meter.