Controlled Load - SA - New Variable Charges

bdog
Switched-on
2 Replies 7790 Views

I'm in SA. I've just received a change of rates notice from AGL, which includes time zones with varying rates (Peak / Off Peak / Shoulder). Previously, my understanding was the controlled load only functioned off peak.

 

Question1:

I have a HWS connected to controlled load. Will this now function throughout the day? If not - how is the timing managed?

 

Question2:

I have solar. Will devices connected to controlled load consume solar power that would otherwise be exported - OR - do I simultaneously export solar on "normal" circuit, and consume grid power on controlled circuit?

5 REPLIES 5
eGeorge
Semiconductor
1 Reply 7473 Views

Great questions!

I wish AGL would answer these promptly. 

I am building a new home with 7.2Kw solar panels and 3 phase power (no battery for now). I too want to be able to boost HWS during daytime hours (ideally using solar) but still run off J tariff at night (off peak) so I too am seeking the best way to configure my HWS to achieve this (timers?)  Presently my builder is looking at installing a single element 315litre HWS unit.
Will share info if I receive any response from AGL. Cheers. 

bdog
Switched-on
1 Reply 7471 Views

I've called customer support - landed with someone who didn't know about it - promised to call me back the next day, and I'm still waiting (2 or 3 months later). Great that they attempt to outsource customer support to us, and don't get involved when there is obviously no (reasonable) answers provided.

 

Electricians I have dealt with (3 or 4 different individuals) are also unsure - but are quite sure it's up to the retailer (AGL) to control via the meter.

 

I did get an electrician to connect a manual switch between Controlled/Standard meter - and then found the Controlled load is only Live at the "old" times (which is something like 1am - 6am). I'm guessing a bit on this - not giving up my sleep to find out!

 

Hi AGL - your input would be appreciated? I have a new schedule of rates which covers 24 hours for controlled load - but I don't have power available for 24 hours through my meter.

David_AGL
AGL Community Manager
0 Replies 7411 Views

Hi @bdog  great questions, heres some clarification, straight from our Resolutions team:

 

Existing cutomers with smart meters are having a like-for-like transition with your controlled load. This means your hot water system will still function as it has been previously, separate to your solar generation and general usage.

 

If you would like to change your hot water system to utilize the solar and peak/off peak tariffs you can have an electrician rewire your system, otherwise it will be just your general usage that changes over.

You do have the options to swap to a "solar sponge" tariff for hot water, which will give you two lots of heating through the day, and utilize excess solar in the network however will not be directly impacted by your solar.

 

If you would like to discuss your options, get in touch by logging in to your My Account and clicking the Message button in the bottom right.

Billysalas
Switched-on
1 Reply 96 Views

This is definitely good content, which can become a long-term reference document for many people. 

Lester
Powerhouse
0 Replies 82 Views

..
@Billysalas things have changed a lot since these replies mid 2021.

But it is good to have these threads for past reference.

 

Back then CL was set for best rate / lower demand on the grid, which used to be off peak in the wee hours, in SA 1130 - 0530.

Now, with SA's renewables glut from residential (and other small scale) PV feed in during the solar soak hours, the shoulder period is the new cheaper time, 1000 - 1500.

Shoulder overtook off peak a while ago in SA, which can be handy for the HWS and keeping more hot water for start and end of day.

 

We used to be on CL, but had our HW switched to normal circuit (for various reasons / benefits), but before we did, we would get a big heating of HW done in shoulder period, then another short one in off peak, sometime around 0200 - 0400, and although at slightly higher cost, that would not have added more than 10c - 20c cost for that top off.

We had no control over that big heat and small top off timings, that would have been set by SAPN, our DNSP.

Our HW each day was around $1.30 - $1.40 before we changed things, now it's around 40c a day.