<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Controlled load cost during solar production in Meters &amp; Connections</title>
    <link>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-load-cost-during-solar-production/m-p/39914#M2918</link>
    <description>&lt;P&gt;&lt;EM&gt;"In New South Wales, from 1 July 2024 Ausgrid has both overnight and daytime operating windows as standard for controlled load 1 tariffs. An overnight-only option is no longer available. We’re adding a daytime operating window for our customers who have a Controlled Load 1 tariff in line with the available timings that Ausgrid has set."&lt;/EM&gt;&lt;/P&gt;&lt;P&gt;Below is a sample of my AGL meter data for this 30min period to demonstrate my question.&lt;/P&gt;&lt;TABLE width="628px"&gt;&lt;TBODY&gt;&lt;TR&gt;&lt;TD width="159.517px"&gt;RateTypeDescription&lt;/TD&gt;&lt;TD width="142.483px"&gt;StartDate&lt;/TD&gt;&lt;TD width="159.317px"&gt;EndDate&lt;/TD&gt;&lt;TD width="165.683px"&gt;ProfileReadValue Kw&lt;/TD&gt;&lt;/TR&gt;&lt;TR&gt;&lt;TD width="159.517px"&gt;Solar&lt;/TD&gt;&lt;TD width="142.483px"&gt;31/01/2025 14:00&lt;/TD&gt;&lt;TD width="159.317px"&gt;31/01/2025 14:29&lt;/TD&gt;&lt;TD width="165.683px"&gt;1.388&lt;/TD&gt;&lt;/TR&gt;&lt;TR&gt;&lt;TD width="159.517px"&gt;Generalusage&lt;/TD&gt;&lt;TD width="142.483px"&gt;31/01/2025 14:00&lt;/TD&gt;&lt;TD width="159.317px"&gt;31/01/2025 14:29&lt;/TD&gt;&lt;TD width="165.683px"&gt;0&lt;/TD&gt;&lt;/TR&gt;&lt;TR&gt;&lt;TD width="159.517px"&gt;Controlledload&lt;/TD&gt;&lt;TD width="142.483px"&gt;31/01/2025 14:00&lt;/TD&gt;&lt;TD width="159.317px"&gt;31/01/2025 14:29&lt;/TD&gt;&lt;TD width="165.683px"&gt;0.543&lt;/TD&gt;&lt;/TR&gt;&lt;/TBODY&gt;&lt;/TABLE&gt;&lt;P&gt;My question is, when controlled load 1 is turned on during the day and solar is being produced at the same time, how much am i paying for the controlled load energy ?&lt;/P&gt;&lt;P&gt;Because it is my solar production that is being feed to the controlled load device, what am i being charge ?&lt;/P&gt;&lt;P&gt;Normal controlled load rate ? with no feed in tariff ?&lt;/P&gt;&lt;P&gt;Thank you for anyone who can explain.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Sun, 02 Feb 2025 03:34:05 GMT</pubDate>
    <dc:creator>FredS</dc:creator>
    <dc:date>2025-02-02T03:34:05Z</dc:date>
    <item>
      <title>Controlled load cost during solar production</title>
      <link>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-load-cost-during-solar-production/m-p/39914#M2918</link>
      <description>&lt;P&gt;&lt;EM&gt;"In New South Wales, from 1 July 2024 Ausgrid has both overnight and daytime operating windows as standard for controlled load 1 tariffs. An overnight-only option is no longer available. We’re adding a daytime operating window for our customers who have a Controlled Load 1 tariff in line with the available timings that Ausgrid has set."&lt;/EM&gt;&lt;/P&gt;&lt;P&gt;Below is a sample of my AGL meter data for this 30min period to demonstrate my question.&lt;/P&gt;&lt;TABLE width="628px"&gt;&lt;TBODY&gt;&lt;TR&gt;&lt;TD width="159.517px"&gt;RateTypeDescription&lt;/TD&gt;&lt;TD width="142.483px"&gt;StartDate&lt;/TD&gt;&lt;TD width="159.317px"&gt;EndDate&lt;/TD&gt;&lt;TD width="165.683px"&gt;ProfileReadValue Kw&lt;/TD&gt;&lt;/TR&gt;&lt;TR&gt;&lt;TD width="159.517px"&gt;Solar&lt;/TD&gt;&lt;TD width="142.483px"&gt;31/01/2025 14:00&lt;/TD&gt;&lt;TD width="159.317px"&gt;31/01/2025 14:29&lt;/TD&gt;&lt;TD width="165.683px"&gt;1.388&lt;/TD&gt;&lt;/TR&gt;&lt;TR&gt;&lt;TD width="159.517px"&gt;Generalusage&lt;/TD&gt;&lt;TD width="142.483px"&gt;31/01/2025 14:00&lt;/TD&gt;&lt;TD width="159.317px"&gt;31/01/2025 14:29&lt;/TD&gt;&lt;TD width="165.683px"&gt;0&lt;/TD&gt;&lt;/TR&gt;&lt;TR&gt;&lt;TD width="159.517px"&gt;Controlledload&lt;/TD&gt;&lt;TD width="142.483px"&gt;31/01/2025 14:00&lt;/TD&gt;&lt;TD width="159.317px"&gt;31/01/2025 14:29&lt;/TD&gt;&lt;TD width="165.683px"&gt;0.543&lt;/TD&gt;&lt;/TR&gt;&lt;/TBODY&gt;&lt;/TABLE&gt;&lt;P&gt;My question is, when controlled load 1 is turned on during the day and solar is being produced at the same time, how much am i paying for the controlled load energy ?&lt;/P&gt;&lt;P&gt;Because it is my solar production that is being feed to the controlled load device, what am i being charge ?&lt;/P&gt;&lt;P&gt;Normal controlled load rate ? with no feed in tariff ?&lt;/P&gt;&lt;P&gt;Thank you for anyone who can explain.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Sun, 02 Feb 2025 03:34:05 GMT</pubDate>
      <guid>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-load-cost-during-solar-production/m-p/39914#M2918</guid>
      <dc:creator>FredS</dc:creator>
      <dc:date>2025-02-02T03:34:05Z</dc:date>
    </item>
  </channel>
</rss>

