<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Controlled Load Timings in SA in Meters &amp; Connections</title>
    <link>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-Load-Timings-in-SA/m-p/39261#M2861</link>
    <description>&lt;P&gt;Hi GarryDD55, It would be best to engage with an electrician who can provide you options to rewire your Controlled load to supply power in off peak and shoulder only. Cheers, Deepesh&lt;/P&gt;</description>
    <pubDate>Tue, 19 Nov 2024 02:14:01 GMT</pubDate>
    <dc:creator>Deepesh_AGL</dc:creator>
    <dc:date>2024-11-19T02:14:01Z</dc:date>
    <item>
      <title>Controlled Load Timings in SA</title>
      <link>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-Load-Timings-in-SA/m-p/39247#M2860</link>
      <description>&lt;P&gt;Con the controlled meter be set to supply power only in the off peak and shoulder time periods. I have been notified that the peak rate is changing from 18c to 49c.&lt;/P&gt;</description>
      <pubDate>Fri, 15 Nov 2024 05:52:42 GMT</pubDate>
      <guid>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-Load-Timings-in-SA/m-p/39247#M2860</guid>
      <dc:creator>GarryDD55</dc:creator>
      <dc:date>2024-11-15T05:52:42Z</dc:date>
    </item>
    <item>
      <title>Re: Controlled Load Timings in SA</title>
      <link>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-Load-Timings-in-SA/m-p/39261#M2861</link>
      <description>&lt;P&gt;Hi GarryDD55, It would be best to engage with an electrician who can provide you options to rewire your Controlled load to supply power in off peak and shoulder only. Cheers, Deepesh&lt;/P&gt;</description>
      <pubDate>Tue, 19 Nov 2024 02:14:01 GMT</pubDate>
      <guid>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-Load-Timings-in-SA/m-p/39261#M2861</guid>
      <dc:creator>Deepesh_AGL</dc:creator>
      <dc:date>2024-11-19T02:14:01Z</dc:date>
    </item>
    <item>
      <title>Re: Controlled Load Timings in SA</title>
      <link>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-Load-Timings-in-SA/m-p/39264#M2862</link>
      <description>&lt;P&gt;Thanks Deepesh. I will need to do something.&lt;/P&gt;</description>
      <pubDate>Tue, 19 Nov 2024 05:34:57 GMT</pubDate>
      <guid>https://neighbourhood.agl.com.au/t5/Meters-Connections/Controlled-Load-Timings-in-SA/m-p/39264#M2862</guid>
      <dc:creator>GarryDD55</dc:creator>
      <dc:date>2024-11-19T05:34:57Z</dc:date>
    </item>
  </channel>
</rss>

